Client: SpieCapag

Scope of work: 22”, 32” & 34”, X60 gas line, challenging rainforest pipeline route 

22” x 15.9 & 17.7mm – 1436 welds

32” x 19.4-25.2mm – 20,722 welds

34” x 23.4-28mm – 2063 welds

Saturnax welding stations, welding GMAW

Internal line-up re-rounder clamp with copper backing shoes

  • 4 % repair rates
  • 90 best day weld rate
  • 29 average day weld rate

In the depths of the Papua New Guinea rainforest, Serimax’s welding and maintenance teams braved the overpowering combination of heat, humidity, rain and mud to achieve strong performance on the PNG LNG project for ExxonMobil.  A key take-away from this project has been Serimax’s strong performance in the management of Health, Safety, Security and Environmental challenges.  The 22”, 32” and 34” scope of work of over 24,200 welds is currently in its final production phases.