Project name and Location
PDET J-Lay, Campos Basin
Description
1,207 wls, 15 repairs (1.24%)
Demobilisation ongoing
Timeframe
April 2007 (production start) to October 2007 (estimated completion date)
Project type
Offshore
Scope
18" x 15.9 mm / 18" x 17.5 mm
18" x 19.1 mm / 18" x 22.2 mm
18" x 25.4 mm / 18" x 28.6 mm
Project name and Location
Manaus, Manaus, Brazil
Timeframe
April 2007 (production start) to June 2007
Project type
Offshore
Scope
820 welds of 20" x 0.5", X70
Specification
BS 4515: 2000
Project name and Location
Tyrihans, Tyrihans, Norway
Timeframe
April 2007 (production start) to August 2007
Project type
Offshore
Scope
575 welds of 16" x 0.822", X65 pipe + 3 mm 316L
15 welds of 16" x 0.822", X65 pipe + 3 mm 316L
1,157 welds of 18" x 0.822", X65 pipe + 3 mm 316L
Specification
FDNV OS F101 + Statoil TR 1096
Project name and Location
OSO 12â repair, Nigeria
Timeframe
May 2007 (production start) to June 2007
Project type
Offshore
Scope
377 welds of 12.75" x 0.625", X60 pipe
Project name and Location
Marsopa Project, Marsopa
Timeframe
End July 2007 (production start) to August 2007
Project type
Offshore
Scope
2,787 welds of 20" x 0.437", X52 pipe
Specification
API 1104 19th Ed. + PEMEX Specification