Project name and Location
Maersk Affleck, Scotland
Timeframe
January 2007 (production start) to March 2007
Project type
Spoolbase
Scope
2,354 welds of 12.75" x 0.562", X60 pipe
2,354 welds of 8.625" x 0.811", X60 pipe
Project name and Location
Atlantis DC 03, Mobile, Alabama
Timeframe
January 2008 (production start) to February 2008 (estimated completion date)
Project type
Spoolbase
Scope
550 welds of 10.75" x 1", X65 pipe
Project name and Location
Thunderhorse, Fourchon
Timeframe
February 2008 (production start) to October 2008 (estimated completion date)
Project type
Spoolbase
Scope
200 welds of 10.75" x 1.161", X65 pipe
838 welds of 10.75" x 1.161", X65 pipe
525 welds of 10.75" x 1.161", X65 pipe
Project name and Location
Tyrihans Meg Line Fabrication, Kristiansund
Timeframe
Q1 2008
Project type
Spoolbase
Scope
3" x 6.9 mm, 3,600 welds
2.5" x 9.7 mm, 110 welds
Project name and Location
Shenzi, USA
Timeframe
Q3 - Q4 2007
Project type
Spoolbase
Scope
6.625" x 0.625" Flowlines, 262 welds
6.625" x 0.625" SCR, 358 welds
8.625" x 1.000" Flowlines, 319 welds
8.625" x 1.000" SCR, 344 welds
10.75" x 0.875" Flowlines, 439 welds
10.75" x 1.160" Flowlines, 285 welds
10.75" x 1.160" SCR, 341 welds